You have two choices when it comes to putting up a fence on sloped ground -- actually, you have three, because it's possible combine the first two options into another one. Two of the options are to follow the slope of the ground with the fence line -- which is called raking -- or to keep the fence line horizontal and follow the ground in steps. The third -- hybrid -- approach is to follow the ground with the rails while keeping the fencing slats or pickets vertical. Raking keeps the fencing close to the ground and works well on shallow slopes, while the stepped approach works best on steep slopes.

Advertisement

Considering Fencing Material

When erecting a wood fence with slats and rails, you can choose either to rake or step the sections between posts, but the use of fencing panels constrains you to the stepped approach. When installing a chain-link or metal fence, the angles of the rails are usually adjustable to some degree. If the slope exceeds 12 inches across a 6-foot length, you must usually use the stepped method. Moreover, even when the slope is gentle, raking creates a fair amount of extra work when installing a chain-link fence because you have to cut the ends of the metal mesh at an angle.

Advertisement

Video of the Day

Tip

Typical spacing for wood and metal fences is 8 feet, but if you're using the step method on a steep slope, you'll probably have to reduce the spacing to avoid the need for an excessively long post on the downslope side.

Using the Step Method

Step 1: Start on the Highest Ground

Set the first post, and after leveling and securing it, mark a point 4 inches from the ground and draw a string to the location of the next post . Level the string, measure the distance from the ground and subtract 4 inches. Cut the post for that location that much longer than the first post, remembering to add an extra third of that distance to the bottom of the post so you can set the post deeper. Set that post level, and use it to determine the length of the third post, and so on.

Step 2: Set Rails, Panels or Sections of Metal Fencing

Use the 4-inch marker on the first post as the reference for the bottom comer of the first wood panel or section of metal fencing. If you're constructing a slat-and-rail fence or picket, attach one end of the bottom rail at that mark and extend the rail to the next post. using a level to make it horizontal. The top rail is automatically horizontal if it's the same distance from the bottom rail on both posts.

Advertisement

Step 3: Attach Slats

Make each slat vertical using a level before attaching it to the rails with screws, if you're constructing a slat-and-rail or picket fence. The level is also a handy tool for making sure the top of each slat is at the same level as the others before you attach it.

Step 4: Fill in the Gap

Prevent animals from passing under the fence by filling in the section underneath the panel or bottom rail. One way to do this is to attach horizontal boards to the bottom rail and one of the posts. Another is to staple wire mesh to the bottom railing. You can even construct raised planters.

Advertisement

Using the Rake Method

Step 1: Lay Out and Set the Posts

The posts can all be the same length or you can cut them different lengths to make the top of the fence level. If you choose the second option. which works best on gently sloping ground, start on the highest ground; cut that post to the height of the fence, set it, measure its height and stretch a line level to the next post. Measure the height of the line above the ground and add the extra distance -- plus one third -- to the length of the next post.

Tip

Although it wastes wood, you can also make all the posts longer than necessary and cut them level after setting them all.

Step 2: Angle the Ends of the Rails

Adjust the holders on the ends of metal rails to the proper angles before connecting them to the posts with appropriate fasteners. If you're installing a wood fence, bevel the ends of the rails with a circular saw before attaching them to the posts with screws.

Advertisement

Step 3: Install the Fencing

When installing metal mesh, cut the ends of the mesh at an angle so that the mesh follows the rails while the ends are straight with respect to the posts. Install wood slats or pickets a uniform distance from the ground. You can either set them vertical or perpendicular to the rails. If you choose the first option, you may have to cut the bottoms to conform to the slope of the ground.

Advertisement


Chris Deziel is a contractor, builder and general fix-it pro who has been active in the construction trades for 40 years. He has degrees in science and humanities and years of teaching experience. An avid craftsman and musician, Deziel began writing on home improvement topics in 2010. He worked as an expert consultant with eHow Now and Pro Referral -- a Home Depot site. A DIYer by nature, Deziel regularly shares tips and tricks for a better home and garden at Hunker and Family Handyman.